GLASS OPERATING ROOM
GLASS OPERATING ROOM
GLASS OPERATING ROOM
GLASS OPERATING ROOM
  • GLASS OPERATING ROOM
  • GLASS OPERATING ROOM
  • GLASS OPERATING ROOM
  • GLASS OPERATING ROOM

GLASS OPERATING ROOM

GLASS OPERATING ROOM

Description

TECHNICAL PARAMETER

01Double-layer gold crystal ultra-whitetempered glass,thickness can be customized,5mm/6mm

07Diversified structure,issued comprehensiveand deepened installation and process plans,and connected with various constructionplans

02 High-quality double-layer 0.8EVA film,innerinterlayer UV high-definition lamp,high colorreduction,aging resistance and anti-fading

08Design and construction drawings includekeel assembly or welding details

03 Interlayer UV can be customized accordingto color card or customized high-definitionprinting graphics and text

04 Concealed rear projection atmosphere lightbox,atmosphere light supports RGB colorfuldynamic output,and can customize theanimation effect of illusion color light

09The installation scheme of wall glass canadopt calcium silicate plate back adhesivebonding or electrolytic steel plate foamingbonding and then on-site hanging platewelding

10Fully consider the site effect and support theoverall color matching design of supportingequipment cabinets

WALL PANEL CHARACTERISTICS

01 Install the laminar flow hood in theoperating room

04 Install electrical appliances,lamps,etc

1.Assemble the box and face frame on site,and keepthe box insulated2.Punch the hanging bars and install the hanging barsand basket screws3.Box hoisting4.The box is connected with the air duct5.A clearance of 100MM shall be reserved betweenthe box and the ceiling plate for the installation of theceiling plate6.After the panel is assembled,it is placed in theoperating room for later installation

Power-on test of equipment cabinets such aspurification lamp,socket,film viewing lamp,writingtable,laminar flow hood,and joint commissioning andtest of information panel

05 Glue the gap of wallboard

Paste masking paper on site and apply glue evenly onthe seam to ensure air tightness

06 Cleaning

02Install the ceiling plate1.Positioning and welding of keel and angle iron;2.Hang electrolytic steel plate ceiling plate andconduct spot welding for reinforcement

The surface of walls and cabinets can be cleaned anddisinfected with alcohol and 84 disinfectant

07Finished product protection

Paste protective film and finished product protectionlabel

03 Install the operating room laminar flowcover frameAfter the ceiling board is installed,use the blue screwsto adjust the height of the laminar flow cover bodyto the level of the ceiling in the operating room,and install the laminar flow cover frame from theoperating room

08 Inspection and acceptance

The plug surface is flat,without scratches,with stablestructure,and the electrical circuit is safe and reliable

send inquiry to us

Related Product

Chat with us